Search Maine Yellow Pages 
Log In | Register | Help
Maine to Mars Blog Index
January 15, 2008
...and then I got sick

Now I'm better, and back to work. I'm working the second shift this week so we can finish all the FVTs. We haven't had to run these in about 6 months. They were designed to test all the functionality of each instrument. We ran these tests each time a new version of Flight Software (FSW) came out. Now that the spacecraft is on its way, the FSW version is pretty much fixed. But each instrument has an executable that contains its specific code. These were recently updated, and we're testing them before they get transfered to Phoenix.

As I type, I'm monitoring one of the MECA tests. It's about 4 or 5 hours long, typical of the FVTs. It takes almost the whole week, running a second shift, to get through all the tests. This test checks the MECA Stage; basically a plate with dimples around the edge, in which a soil sample sits. The plate can rotate and translate, bringing the sample to the Atomic Force Microscope or the Optical Microscope.

MECA is easily the most complicated instrument, if by nothing else the sheer number of commands and telemetry.

Posted at 09:47 PM

E-mail this entry to a friend

Comments
Post a comment









Remember personal info?







Please enter the code as seen in the image above:



Blog Index

A native Mainer writes about his experiences as an engineer for the Phoenix Mars Mission, an effort to see if a robotic lander can find evidence that life once existed on Mars.

Robert Bovill was born at Maine Medical Center July 5, 1979. He graduated from Thornton Academy in 1998. He graduated with a bachelor's degree in physics from the University of Maine in Orono, and then went to the University of Arizona for graduate school. He was employed full-time as a test engineer for this Phoenix Mars Mission a year and a half ago by the University of Arizona.



See a rendering of the Phoenix Mars lander during the final seconds of descent.

See the instruments on the Phoenix Mars lander.

Abbreviation Glossary

Testing  
FVT   Functional Verification Test
GDS   Ground Data System
OPUS Odyssey/Phoenix UHF System
ORT Operational Readiness Test/Training
PIT    Payload Inter-operability Testbed
PTL Payload Testbed Lab
PVV Payload Verification and Validation
   
Places  
JPL  Jet Propulsion Laboratory
LM  Lockheed-Martin
UA/LPL University of Arizona/Lunar and Planetary Lab
   
Events
EDL  Entry, Descent and Landing
   
Instruments
EM  Enginerring Model
FM Flight Model
ISAD Icy Sample Acquisition Device
MECA Microscopy, Electrochemistry, and Conductivity Analyzer
OM Optical Microscope
RA Robotic Arm
RAC Robotic Arm Camera
RASP Rapid Active Sampling Package
SSI    Surface Stereoscopic Imager
TECP   Thermal and Electrical Conductivity Probe
TEGA  Thermal and Evolved Gas Analyzer
Updates
Sign up to be notified when there's a new entry
RSS
Subscribe
Archives