ORT Prep
As I said, we have been preparing for the upcoming ORT (Operational Readiness Test) for the last several weeks. A lot of the software testing has been done, and we're mainly fine-tuning the tests at this point. The work is now shifting to more of the physical setup.
This round of ORTs will include some hefty RA work, just to prepare for the test. The Arm will be digging a large trench, around 20cm deep and about a meter square. Several of us spent much of Friday prepping the digging bin with different soils. We managed to get quite dirty doing so! After we put the bin back in place, we spent time arranging the area around the lander, including getting rocks of appropriate sizes AND abundances for the region we are studying.
Posted
at 08:25 PM
E-mail this entry to a friend